Concrete Cost Calculator

What a pour costs — ready-mix or bags, with delivery, labour and tax shown.

Pour

Unit system

Code references and product data are quoted in the units their source uses.

= 240" (20')

= 144" (12')

= 4"

Advanced

Labour and extras

Live

Concrete Cost · Result

! Check failed

TOTAL COST

1505.00 dollars total

Concrete
$742.50
Volume
3.5 yd³
Extras
$200.00
Labour
$562.50

a short-load fee was given without a threshold, so it was not applied

Waste allowance 10%

SUGGESTED DEFAULT

Output unit defaulted to cubic yards because at least one dimension was entered in imperial units

SUGGESTED DEFAULT

Ready-mix order increment 0.25 yd³ and minimum 1 yd³ are UI defaults; suppliers differ

SUGGESTED DEFAULT

Bag counts use each product's printed approximate yield; cubic-metre yields are derived from the printed cubic-feet figures — see Methodology

MFR SPEC

Line taxability defaulted by category: materials and other taxable, labor not. Treatment of labor varies by state

SUGGESTED DEFAULT
Code references & assumptions · 7

How this result is supported

Overhead, markup, discount and tax are separate lines rather than one multiplier, because the order they apply in changes the total.
SUGGESTED DEFAULTOutput unit defaulted to cubic yards because at least one dimension was entered in imperial units
ASSUMPTION
SUGGESTED DEFAULTReady-mix order increment 0.25 yd³ and minimum 1 yd³ are UI defaults; suppliers differ
ASSUMPTION
MFR SPECBag counts use each product's printed approximate yield; cubic-metre yields are derived from the printed cubic-feet figures — see Methodology
PRIMARY-VERIFIED
ASSUMPTIONReady-mix is priced on the rounded order quantity, not on the volume needed — you pay for the increment the supplier sells in
ASSUMPTION
ASSUMPTIONShort-load fee not applied: no threshold was given, and the quantity below which it applies is supplier-specific
ASSUMPTION
ASSUMPTIONTax applied to the taxable share of direct cost, carried proportionally through overhead, markup and discount
ASSUMPTION
SUGGESTED DEFAULTLine taxability defaulted by category: materials and other taxable, labor not. Treatment of labor varies by state
ASSUMPTION
What do these evidence labels mean?
PRIMARY-VERIFIED
directly supported by one authoritative primary source, quoted with section/page/figure
CROSS-VERIFIED
independently supported by two or more appropriate authoritative sources
DERIVED
mathematically derived from PRIMARY-VERIFIED values; the derivation is preserved in data and in code
INTERPRETED
a source exists but translating it into calculator behaviour required interpretation
CONVENTION
recognised trade practice, not a mandatory provision
ASSUMPTION
product/design assumption or useful default with no authoritative basis
UNVERIFIED
insufficient authoritative evidence
Full methodology →

Code references and product data are quoted in the units their source uses.

Reference checks are informational, not compliance determinations.

How concrete cost is calculated

The cost starts from the same volume the concrete calculator produces, so the quantity you are charged for is the quantity you would order — waste and the quarter-yard step included, not quietly dropped.

Ready-mix and bags are priced differently and the calculator keeps them apart: ready-mix takes a price per yard plus any delivery and short-load fees, bags take a price per bag against the product's own yield.

Overhead, markup, discount and tax are separate lines rather than a single multiplier. A total you cannot take apart is a total you cannot check against a quote, and the order they apply in changes the answer.

materials = order quantity × price per unit

Or bags × price per bag.

subtotal = materials + rebar + extras + labour

total = (subtotal + overhead + markup − discount) + tax

Questions

Why was my short-load fee not applied?
Because a short-load fee needs a threshold — the order quantity below which the supplier charges it. Without that number the calculator cannot know whether your pour is short, so it says so rather than guessing and quietly adding a fee.
Does this include the cost of the sub-base or the forms?
Only if you add them as extras. The calculator prices the concrete, and anything else a job needs — gravel, forms, reinforcement mesh, pump hire — goes in as a line you name, so the total says what it is made of.